Skip to content
Eggshell & Co Painting 09 870 5756

Painting new plasterboard and renovations

New linings and renovation work are painted in a different order from a repaint: seal the new plasterboard, check the stopping under raking light, then finish coats, all timed around the other trades. GIB treats a Level 4 plasterboard finish as standard for flat or low-sheen paint. The interior painting page covers repainting existing rooms.

Many paint tins with stirring sticks on a workbench
Paint tins with their stirring sticks. A written quote should name the products going on each surface. Photo: Phil Roeder from Des Moines, IA, USA, CC BY 2.0

Plasterboard levels of finish

GIB’s site guide sets out levels of finish for plasterboard before it is painted. Level 4 is the default for walls and ceilings in flat or low-sheen paint. Level 5 is for gloss or semi-gloss paints, or for critical lighting, where light hits the surface at a low angle. Level 5 is harder to achieve and needs the plasterer and painter to work together.

Agree the level before the plasterer starts, not after. A painter cannot make a Level 4 wall look like Level 5 with paint, and a glossy finish or a long window beside a wall will show any join that was not finished for it.

Critical light and why joins show

Critical lighting is light that strikes a wall or ceiling almost parallel to it, from a long window or a downlight close to the wall. It throws shadows from the smallest ridge or dip. GIB notes that sprayed paint can make imperfections more visible, and recommends planning layout and light as well as the finish level.

Sealing new linings

New plasterboard is sealed first with a plasterboard sealer or primer to even out the paper face and the jointing compound, which absorb paint at different rates. Without it, joints show as bands of different sheen. Then the walls are checked, any flaws spot-filled and sanded, and two finish coats go on.

  1. Dust down after sanding; dust under paint causes poor adhesion.
  2. Seal with a plasterboard sealer.
  3. Check under a work light; spot-fill and sand.
  4. Two finish coats in the agreed sheen.

Primers and undercoats explains sealers in more detail.

Six-step diagram of the order a room is painted in, from clearing to touch-ups
Top to bottom: ceiling, walls, then trim and doors.

Fitting in with the other trades

On a renovation, painting follows the plasterer and comes before carpet and final fittings. Trim and doors are often primed before they are hung and finished once installed. Bathrooms and kitchens are painted before fittings go in where possible, which saves cutting in around them, then touched up after.

Dusty work after the paint is on spoils it, so the order matters more than speed. A builder running the project usually sets the programme; the painter’s quote should say which stages it covers.

New timber and pre-primed cladding

New weatherboards and trim usually arrive pre-primed, which protects them for a limited time and is not a finished coating. The priming coat is checked, any cut ends and nail holes primed, then the system is completed with two topcoats. BRANZ advises priming on site only when timber moisture content is within about 14% to 18%.

For exterior systems on new timber, see how many coats of paint.

Renovating an older house

Renovating a house from the 1980s or earlier disturbs old paint, which WorkSafe advises presuming contains lead, and a house built before 2000 may contain asbestos in linings, ceilings or claddings. The Asbestos Regulations require asbestos likely to be disturbed in a home refurbishment to be identified first. Painting comes after that has been dealt with.

Asbestos and textured ceilings covers the check, and lead paint in older homes covers old paint.

Costs for new work

Published rates for new-build interior walls run about $26 to $39 per m² before GST on one guide, and $30 to $45 per m² on another. Resene’s trade guide gives a floor-area rate of upwards of $70 per m² for a new house interior with three coats. Level 5 finishes, high studs and a lot of trim add to it.

Renovations that are building work over $30,000 including GST need a written contract under the Building Act; reading a painting quote covers what to look for.

Asked before a repaint

What level of plasterboard finish do I need before painting?
GIB’s site guide treats Level 4 as the default finish for walls and ceilings painted in flat or low-sheen paint. Level 5 is for gloss or semi-gloss paints, or where light strikes the surface at a low angle and shows every join. Level 5 takes extra work and needs the plasterer and painter to work together.
Does new plasterboard need a sealer?
Yes. New plasterboard has a paper face and jointing compound that absorb paint differently, so a sealer or primer goes on first to even out the porosity. Without it, joints can show through the finish as dull or shiny bands, known as flashing.
How much does it cost to paint new plasterboard?
Published figures for new-build interior walls run from about $26 to $39 per m² before GST on one guide and $30 to $45 on another. A floor-area rate is also published for new houses. Ceilings, trim, high studs and a Level 5 finish add to it.
When should the painter come in on a renovation?
After the plastering is finished and dry, and before the finishing trades that would be damaged by paint work, such as carpet layers. Trim is usually primed early and finished late. Good sequencing avoids paint going on before dusty work is done.

Sources

For the whole picture, from prep to the last coat, go back to painting houses across Auckland.

Ask us for a painting quote

Tell us about the house and the job. We reply with questions, or a day to walk around it with you.

Start a quoteCall 09 870 5756