Repainting a unit-title building is a planned project rather than a single quote: the body corporate decides, residents are notified, and the work is staged face by face so people can keep living there. Published Auckland figures for commercial repaints sit around $40 to $50 per m². It sits alongside our commercial painting work and uses the same exterior methods as a house.

Four-storey apartment building in brown and cream on a sloping Avondale street
An apartment block in Avondale, Auckland. Repaints on buildings like this are staged face by face around residents. Photo: Ingolfson, Public domain

Who is responsible for what

In a unit-title development, the body corporate maintains the common property and the building elements and infrastructure that serve more than one unit, according to Unit Titles Services. Exterior walls, roofs and shared stairwells usually fall on the body corporate; each owner looks after the inside of their own unit. The body corporate rules fill in the detail.

That split decides who signs the quote. An exterior repaint is a body corporate decision, made by the committee or at a general meeting depending on its size and the rules. An owner repainting their own interior deals with the painter directly, though the rules may cover noise, hours and access to shared areas.

Long-term maintenance plans

Every body corporate must keep a long-term maintenance plan covering at least 10 years, and developments with 10 or more principal units must plan 30 years ahead. Those rules took full effect on 9 May 2024. The plan is reviewed every three years, and a repaint is usually one of its biggest forecast items.

A painter’s condition notes are useful for the plan. Asking for a walk-around a year or two before the forecast repaint shows whether the date is right: south faces and sheltered walls may last longer, while exposed balconies and sills may need work earlier. The commercial repaint planning note covers the timeline.

What a body corporate repaint covers

A typical exterior repaint covers walls, soffits, fascias, balustrades, doors and window frames, plus any shared stairwells and corridors. The quote should list each building or face, the cladding and its system, the prep and repairs allowed for, access equipment, and the order the work will run in.

Stepped diagram of the order of a repaint, from washing to finish coats
Most of the hours on a repaint sit in the prep rows, before any finish coat goes on.

Cladding and moisture checks

Many Auckland apartment and townhouse buildings from the 1990s and 2000s have plaster or sheet claddings. Painting them follows the cladding maker’s coating system, keeps control joints and flashings working, and does not seal over problems. If there are signs of water getting in, a building surveyor looks first, because paint is not a repair.

Brick, plaster and roughcast covers the coating side. Older blocks from before 2000 may also have materials that contain asbestos in soffits or sheet linings, which are checked before any sanding.

Working around residents

Residents get notice before work starts on their part of the building, with the dates their windows, balconies and doors will be affected. Work is staged so entrances, parking and lifts stay usable. Inside common areas, low-odour paints and short working windows reduce disruption. Balcony furniture and plants need moving before each face starts.

  1. Notice to all residents with the programme and a contact.
  2. Face-by-face staging, with a few days’ warning for each.
  3. Balconies cleared by residents before their face starts.
  4. Windows kept shut on the face being prepared or sprayed.
  5. Final walk-around with the committee before sign-off.

What it costs

Published figures for commercial repaints in Auckland run at about $40 to $50 per m², and a national guide gives $30 to $60 per m² for body corporate exterior cladding and $18 to $30 for common areas inside. Scissor lifts and scaffolding add to that, as do repairs found once access is up.

Published ranges, gathered October 2026. Ranges, not quotes. Wellington figures are noted as such.
Item Published range
Commercial repaint, Auckland $40 to $50 per m²
Body corporate exterior cladding (Wellington guide) $30 to $60 per m²
Body corporate common areas inside (Wellington guide) $18 to $30 per m²
Scissor lift hire (Wellington guide) $800 to $1,500 a day

Health and safety on a shared site

A repaint on an occupied building has more people around it than a house job. The painter, as a business, has duties under the Health and Safety at Work Act 2015 to manage risks to residents and visitors as well as workers, and the body corporate shares duties for its common property. In practice that means barriers, signs and clear access routes.

Lead-based paint is presumed on any building from the 1980s or earlier, so older blocks are prepared wet with containment. See lead paint in older homes.

Asked before a repaint

Who pays to repaint a unit-title building?
Usually the body corporate, through levies. Unit Titles Services explains that the body corporate maintains common property and the building elements and infrastructure that serve more than one unit, which typically covers exterior walls. Owners look after their own unit’s interior. Your body corporate rules and plan set out the detail.
Does a body corporate need a long-term maintenance plan?
Yes. Every body corporate must keep a long-term maintenance plan covering at least 10 years, and developments with 10 or more principal units must plan 30 years ahead, under rules that took full effect on 9 May 2024. The plan is reviewed every three years, and a repaint is one of the items it should forecast.
How much does it cost to repaint an apartment building?
Published figures for commercial repaints in Auckland run about $40 to $50 per square metre, and a national guide gives body corporate exterior cladding at $30 to $60 per m². Height, access equipment, cladding repairs and after-hours work move it. Each building is priced from a site visit.
Can residents stay in their units during a repaint?
Almost always. The work is staged face by face, residents get notice of which windows, balconies and doors will be affected and when, and access to parking and entrances is kept open. Low-odour paints help inside common areas such as stairwells and corridors.

Sources

For the whole picture, from prep to the last coat, go back to Auckland house painters.